Aspect |
Estimated Cost |
Final Cost |
Definition |
An initial approximation of the total project cost based on preliminary plans
and specifications. |
The actual total cost incurred at the completion of the
project. |
Purpose |
To provide a forecast for budgeting, financing,
and planning purposes. |
To determine the actual financial outcome and compare it
with the estimated budget. |
Components |
Includes preliminary costs such as materials, labor, equipment,
overhead, and contingencies. |
Includes all actual expenses such as materials,
labor, equipment, changes, delays, and unforeseen costs. |
Timing |
Prepared before the project begins, often during the planning or
design phase. |
Determined after the project is completed,
based on final accounting and invoicing. |
Accuracy |
Based on assumptions, SORs, historical data, and preliminary designs;
may have a margin of error. |
Reflects the true costs, providing an accurate financial picture. |
Adjustments |
Can be adjusted through value engineering, scope changes, or budget
modifications before construction starts. |
Includes adjustments due to scope changes, unforeseen
conditions, or errors during construction. |
Influence Factors |
Influenced by market conditions, material availability, labor
rates, and economic factors. |
Influenced by actual project execution, weather, site
conditions, and contractor performance. |
Use in Analysis |
Used to set budgets,
secure funding, and evaluate project feasibility. |
Used to assess project performance, financial outcome, and cost
control effectiveness. |
Risk Factors |
Subject to uncertainties and potential cost overruns. |
Reflects the actual risk realized and managed during the
project. |
Preliminary or Approximate or Rough Cost Estimate | Detailed or Item Rate or Unit Price Estimate |
It is done on the basis of past experience and involves approximate calculations. | It is calculated in a Detailed Manner |
Low Accuracy | High Accuracy |
Contingencies are given at 5 to 10 % of the estimated cost | Contingencies are given at (3 to 5%) of the estimated cost |
It is done to obtain Administrative sanction or approval | It is done to obtain technical approval or sanction |